Contact

Select Fill

Building Pads, Sub-grades & Hardstands

Before a slab, a road or a hardstand is built, the ground under it is built up with fill that compacts predictably. That is what select fill is for.

Why controlled fill

A structure needs a platform that will not settle, heave or hold water. Natural ground rarely provides one, so a controlled fill is placed in layers and compacted to a density set by the project engineer, with testing to prove it. The fill has to be uniform — the same material, layer after layer — or the compaction and the testing mean nothing.

What matters in the fill

Consistency first: a screened granular material of even character compacts the same way every time. Drainage: water in the platform is what causes movement, so a free-draining fill is preferred. And workability: a material that spreads and compacts readily with standard plant.

The MRP product

Select Fill from MRP Sand Quarry is a screened granular material supplied for residential and industrial building pads, subdivision earthworks, road and pavement sub-grades, hardstands, access roads and equipment platforms. It is placed in layers and compacted to the specification; the engineer sets the density, the fill is what makes it achievable.

Supply

Bulk supply by the truckload to civil contractors, builders and earthmoving operators across South East Queensland, scheduled against the earthworks program. Tell us the specification, the volume and the site.

Get in touch

0408 450 645

Tell us the product, the tonnes and where it is going.